30 days free, no credit card required
·
Request access →
Private beta
Now open →
Available for
Mac
Windows

Trusted by 100+ businesses




Results
What planners see once the first draft comes from TrafficDesigner.
Lower operating costs
Faster turnaround
Less spent on drafting
More plans per planner
Accuracy
Less project risk
How it works
01
A sentence and an address.
JOB
Kerbside works outside 12 Smith St, Parramatta. Close 30 m of the left lane; both directions share the other lane.|
12 Smith St, Parramatta NSW 2150
Generate
02
With the setup it recommends.
Traffic will share one lane at 60 km/h. How should it be held?
Portable traffic signals
Recommended
Above 45 km/h, signals hold the traffic. 40 km/h roadwork zone.
Stop/Slow with two controllers
Only where the speed is 45 km/h or less.
Not sure
Generating
0:36
0:00
Reading your job
0:06
Having a look at the street
0:07
Thinking about the best setup
0:22
Measuring the road
03
The plan redraws.
Extend the left lane closure by 20 m past the work area.
CHANGE MADE
The closure now runs 20 m past the work area, then tapers back to the kerb.
04
Every sign placed and counted.

SIGN LIST
Sign stands
18
Cones
32
Portable signals
2
Speed signs
6
Standards
Plans follow the rules where the work happens.
Australia
Built in
AS 1742.3 and AGTTM, with each state and territory’s rules
NSW
SA
VIC
QLD
WA
TAS
NT
ACT
New Zealand
New Zealand Guide to Temporary Traffic Management (NZGTTM), which replaced CoPTTM
United States
MUTCD 11th Edition, Part 6 Temporary Traffic Control, with state supplements
United Kingdom
Safety at Street Works and Road Works (the Red Book), and Traffic Signs Manual Chapter 8 for high-speed roads
Another region?
Tell us your standard →
Carlton McNaugh
PlanFast Traffic
Features
Your state’s rules
Spacing, tapers and speed steps set for the road.
Edit anything
Move, resize and relabel like a drawing program.
Aerial maps
Draw over imagery of the actual street.
Full sign library
Every standard sign, plus your own.
Sign and device counts
Every sign, cone and stand, listed for the truck.
Print-ready PDF
Title block, legend and your logo, on any sheet.
Opens your plans
Bring your .tcp files across.
FAQ
Anything else? team@trafficdesigner.ai
Which standards does it follow?
+
Who signs off the plan?
+
How do I get access?
+
Can I see it first?
+
Can I open my existing plans?
+
30 days free · Mac and Windows